Return to Page A A A A M L XL

Saltburn Cliff Tramway - Timeline

Saltburn Cliff Tramway - Timeline

Explore the history and heritage of the Saltburn Cliff Tramway from the day it opened in 1884 to the present day - 28 June 1884:  The tramway opened to the public. With a height of 120 feet and a track length of 207 feet, creating a 1 in 4 (71%) incline. It was built by Tangyes Engineering Company, and it remains today the oldest water-balanced cliff funicular still in operation in Great Britain and the second oldest in the world.1921/22: the track gauge was changed from 1.143m (3ft 83/4ins) to 1.283m (4ft21/2ins). 1924: The gas engine was replaced with a 20 horse power electric pump 1955: The carriage bodies were replaced without stained glass windows 1979: The Wheels and undercarriage of the carriages was replaced and the railway sleepers were renewed 1986: The carriage bodies were re-aligned to the chassis due to very bad docking. 1987: An emergency retard and safety stop function were fitted 1989/90: The carriage overlooking Marske was rebuilt over winter following an accident when lowering the carriages for the winter period. 1990: The Bottom tank was emptied and the foot valve and pump was reconditioned. 1991: The Stained glass windows were reinstated to the carriages by Saltburn artist Chloe Buck. 1993: An interlock for the carriages and station doors were fitted. 1997/98: The interlock system was rewired. 1998: A Sheaf/Winding wheel was replaced and a hydraulic brake system was installed by Skelton Engineering. 2002: The tramways, pump motor were rewound by Dowling & Mills, Middlesbrough. 2003: The carriage ropes were replaced. 2005: The brake blocks were replaced. 2005: Feature lighting was fitted to the track. 2007: A new water pipeline was fitted 2009: The underneath plates of the carriage overlooking Saltburn were taken off and refurbished. 2010/11: Restoration work was carried out to the Tramway at a cost of £30,000. Works included: New slow down system fitted New hydraulic system “complete” fitted A new bumper was fitted to the bottom station A new gate was installed Saltburn side of the top station. The carriages were taken off-site in November 2010 for specialist refurbishment and an intercom system was fitted inside the carriages. New cables were fitted to the carriages. 2012: The top tank roof was replaced, maintenance was carried out to the pump switch including new springs and oil. 2013: A new armoured cable was fitted for bell “uptrack” 2014: The lower timber parts of the bottom station were restored as well as the water lever at the top station rebuilt and new rests system was introduced. 2015: The bottom station docking area was restored. 2017/18: The tramway closed for major refurbishment with of over £400,000 being invested. Work included new  railway sleepers and rails, scotch timbers, lifelines and escape route, carriages refurbishments, band brake, and safer access to winding chamber, water pipe and new fence at the top station. 2018: The Tramway re opened August .

24

Privacy Policy

We regard your privacy as important and any personal information you give to us will be used in accordance with the Data Protection Act and the General Data Protection Regulations.

We do not store personal information about individuals who visit this site except where they provide contact information via our contact us page and contact forms available on various pages throughout the website.

Any information you provide will only be used for the reasons specified and it will not be shared with any third party without your consent, unless required by law.

Your contact details are kept securely and are only accessed by authorised members of staff as part of the provision of school services. If you do not wish us to keep this contact information please tell us.

This website uses Google Analytics which provides statistical data about the usage of the site. This information is not used to identify individuals, but is collected to provide us with an understanding of the areas of interest on our site and how our site is being used.

If you are connected to the internet you will have an IP Address. This may take the form of a figure, such as 333.333.22.1. The address will be automatically collected and logged as part of the connection of your computer to our web server and may be used to determine the total number of visits to each part of the site. This data is not collected and used for other purposes.

This website contains links to other websites. The School is not responsible for the privacy practices of other sites or organisations and recommends you consult the privacy information on those sites.

This policy will be reviewed and updated versions will be posted on the website.

If you have any questions about the use of your personal information, the Information Commissioner is the independent regulator for both Data Protection and Freedom of Information.

Our full GDPR and Data Processing policy for customers can be found by following this link: Link to GDPR Policy